[Xrayops] Injector repair update

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Fri Dec 19 02:35:55 CST 2008


Power supply group personnel are on-site investigating a possible short 
concerning a Booster extraction pulsed power supply. A tunnel access is 
needed. There is not an estimated time of repair currently.


More information about the XRAYOPS mailing list