[Xrayops] stored beam current drop to ~87mA

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Sat Dec 12 18:14:06 CST 2009


On Saturday 12/12/2009 at 18:07 stored beam current dropped from ~98mA to 
~87mA. Top up is ongoing. The situation is being investigated. 

ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list