[Xrayops] (no subject)

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Sun Feb 8 16:55:32 CST 2009


After the fill and shutter permit was granted. we noticed SR coupling 
was 5%. In order to fix this the orbit controllaws have to be suspended. 
The orbit controllaws were turned back on at approximately 16:42. at 
that point the storage ring has been returned to normal.


More information about the XRAYOPS mailing list