Due to an IOC issue, the readbacks for the SR Emittance and Coupling were either unavailable or incorrect between 1415 and 1635 today, Wednesday March 4th 2009. The problem with the IOC has now been corrected. ASD Operations Group Main Control Room (630) 252-9424