[Xrayops] Injector Problem - TopUp Aborted

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Tue Mar 10 06:12:01 CDT 2009


Due to an Injector interlock issue TopUp has been aborted.

Personnel are enroute to investigate with an estimated arrival time of around 
0700.

TopUp operations are not expected to resume prior to Machine Studies starting at 
0800.

Any updates will be posted via email and the Message Board.


ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list