S15B:S3 tripped off on IGBT | Diode OT at 15:33. SR beam lifetime dropped from ~8.2 hours to ~5.4 hours. We are still able to maintain topup operations. Electron beam emittance and coupling changed less than 10%. ASD Operations Group Main Control Room (630) 252-9424