[Xrayops] Beam Motion

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Sat Oct 17 16:31:24 CDT 2009


10/17/2009 15:16 - The vertical orbit correction was suppended due to 
S12A:V2 tripping off thus causing beam motion. Removing S12A:V2 from 
the vertical XRDP Controllaw has stopped beam motion.


ASD Operations Group
Main Control Room
(630) 252-9424


More information about the XRAYOPS mailing list