At 0548 on 4/1/10 a Storage Ring Power Supply failed causing a beam loss. The fault was caused by a water leak from another PS. As of 0630, the swapouts of the 2 Power Supplies are ongoing. Beam should be restored by around 0745. ASD Operations Group Main Control Room (630) 252-9424