[Xrayops] Beam Loss

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Thu Apr 8 02:23:53 CDT 2010


Thursday April 8, 2010 @ 01:54 Stored beam was lost due to RF4LLRF power monitor 
trip. At 02:17 we gave shutter permit to the users with 102mA of stored beam.

ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list