[Xrayops] Top up has reached 100mA
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Fri Apr 9 03:00:28 CDT 2010
The PTB power supply that failed has been replaced by the PS Group.
On Friday April 9th, 20010 at 03:00 Top-Up has raised the stored beam
current to 100mA.
Thank You
Steven LaBuda