[Xrayops] elevated beam motion/beam motion spike

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Tue Dec 21 01:29:54 CST 2010


At 01:22 Operations opened and re-closed the RTFB loops in an attempt to remedy 
the elevated beam motion. This created a temporary spike in beam motion. At 
present, the beam motion levels remain slightly elevated.

ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list