AT 07:44 an RF modulator in the linac tripped that caused us to stop top-up because there was no beam to inject. The trip was reset and Top-up was restarted at 07:50 with 99mA in the storage ring. stored beam was then allowed to accumulate to 102mA at 08:14 - There will be no more disruption due to this failure.