[Xrayops] (no subject)

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Mon Feb 8 08:34:06 CST 2010


AT 07:44 an RF modulator in the linac tripped that caused us to stop 
top-up because there was no beam to inject. The trip was reset and 
Top-up was restarted at 07:50 with 99mA in the storage ring. stored beam 
was then allowed to accumulate to 102mA at 08:14 - There will be no more 
disruption due to this failure.


More information about the XRAYOPS mailing list