[Xrayops] IOC issue fixed

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Tue Feb 23 00:10:52 CST 2010


At 00:05 on 2/23/10, a replacement power supply was installed, correcting the 
problem with the IOC that had caused the beam loss. If no additional problems 
are encountered, beam should be restored by 00:45.


ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list