[Xrayops] stored beam loss on 3/25/10 @17:26

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Thu Mar 25 18:40:12 CDT 2010


On 3/25/10 @17:26 stored beam was lost due to S26B:Q2 power supply 
failing. @17:48 Operations and floor coordinator Clay White started the 
swap out of it.


More information about the XRAYOPS mailing list