[Xrayops] Top-Up Aborted

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Mon Nov 1 01:38:09 CDT 2010


On Monday November 1st, 2010 at 01:28 top-up was aborted due to a Linac 
modulator problem. The RF techs have been contacted and are en route. At this 
time, there is no eta for top-up to resume. 

ASD Operations Group
Main Control Room
(630) 252-9424