[Xrayops] Suspension of top-up

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Wed Nov 17 17:36:23 CST 2010


Top-up was aborted at 17:16, due to an injector problem in the Linac. SR 
current dropped below 100mA at 17:20. The injector was reset and top-up 
was resumed at 17:26.

ASD-Operations


More information about the XRAYOPS mailing list