[Xrayops] Stored Beam
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Thu Aug 4 16:40:07 CDT 2011
Aug. 4, 2011 @ 16:36 There is 102mA of stored beam, shutter permit has been
enabled and Top-Up is on going.
ASD Operations Group
Main Control Room
(630) 252-9424
More information about the XRAYOPS
mailing list