[Xrayops] Top-Up

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Sun Aug 14 12:19:00 CDT 2011


Top-Up was aborted due to a workstation issue at 12:00hrs. With ~100.9mA of 
stored beam Top-Up was re-enable at 12:05.
ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list