[Xrayops] topup resumed at 19:02 with ~97mA remaining SR beam
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Thu Dec 1 19:13:44 CST 2011
PS group personnel locally checked the Booster B:ES1 power supply and did not find any issues. The supply was reset and topup was resumed at 19:02 with ~97mA remaining SR beam.
More information about the XRAYOPS
mailing list