[Xrayops] Beam motion
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Sun Jul 31 10:09:47 CDT 2011
On 31 July 2011 at 09:32 the storage ring beam horizontal and vertical 30Hz beam
motion increased by more than 10%, as a result of timeouts that caused Storage
Ring orbit controllaw to stop running in both planes. There were two significant
spikes in the horizontal plane while controllaw was not running. At 09:37 a 9
micron spike was observed and 10 micron spike at 09:45. In the vertical plane
there was a spike of 1.5microns at 09:45.
Orbit controllaw is now running properly, and beam motion returned to normal
levels by 09:46.
ASD Operations Group
Main Control Room
More information about the XRAYOPS
mailing list