Top-up for Fill #1 was resumed at 15:05 after repairs to the Injector (Linac RF). A fill-on-fill is tentatively scheduled for 15:40 to expedite the increase in SR current to 102mA. ASD Operations Group Main Control Room (630) 252-9424