[Xrayops] Portion of stored beam lost

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Tue Jun 14 07:34:58 CDT 2011


At 07:25 a portion of stored beam was lost. The amount of stored beam dropped to 
~66mA. Top-Up is still ongoing and no fill-on-fill will be scheduled due to 
machine studies @ 0800.
ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list