[Xrayops] Top-up resumed

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Thu Jun 23 02:18:15 CDT 2011


At 02:17 on 06/23/11, top-up was resumed after addressing an injector issue. A 
fill-on-fill may be necessary at 02:50 if SR stored beam current is slow to 
reach 100mA.  

ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list