On Sunday March 13, 2011 at 15:16 stored beam was lost due to a 13ID PSS trip. On Sunday March 13, 2011 at 16:05 shutter permit has been enabled. Fill #14 has started. ASD Operations Group Main Control Room (630) 252-9424