[Xrayops] Top-Up resumed
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Sun Mar 20 11:54:41 CDT 2011
With ~88mA of stored beam, Top-Up was resumed at 12:00hrs. A fill-on-fill with
shutters open is scheduled for 12:00hrs.
ASD Operations Group
Main Control Room
(630) 252-9424
More information about the XRAYOPS
mailing list