[Xrayops] top up and orbit correction

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Fri Mar 25 19:06:44 CDT 2011


At 18:49 top up was restarted and control laws are operating. From ~18:10 to 
18:55 we had minor instances of elevated beam motion in the horizontal plane.



ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list