[Xrayops] Suspension of Top-up

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Sun Mar 27 14:49:14 CDT 2011


On 27 Mar 2011 at ~14:39, Top-up was suspended due to an injector power supply 
tripping off. The power supply has been reset and is currently warming up. 
Barring any setbacks, Top-up operations should resume within the next few 
minutes.

ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list