[Xrayops] Top-up resumed

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Wed Oct 10 19:38:35 CDT 2012


Top-up was aborted @18:57 due to an issue with Booster ramping power supplies. This situation has been corrected. At 19:32, with ~94.7mA, Top-up was resumed. First positive injection occured at 19:34.

MCR Operations
ASD-AOP


More information about the XRAYOPS mailing list