[Xrayops] Top-Up resumed with 102mA stored beam
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Fri Aug 8 00:45:21 CDT 2014
Shortly before midnight repairs were completed on the failed Linac RF system. The injectors were recovered and Top-Up restarted by midnight. A fill-on-fill was performed at 00:30 and Top-Up is ongoing.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20140808/59d7eadc/attachment.html>
More information about the XRAYOPS
mailing list