[Xrayops] Control systems still not functioning, workaround underway
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Fri Jul 4 02:28:50 CDT 2014
Alternative methods to restore the control systems to operations are still under way. As of now, there is no estimated time for a refill. We are attempting to restore the ability to inject into the Storage Ring first. Restoration of orbit control will take much longer, if possible at all with the current workaround.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20140704/36e64090/attachment-0001.html>
More information about the XRAYOPS
mailing list