[Xrayops] Topup resumed at 09:56
APS Experiment Hall X-ray Operations Problem List
xrayops at aps.anl.gov
Thu Apr 2 09:58:07 CDT 2015
Linac RF modulator #1 (L1:MO1) has been repaired. Topup was resumed at 09:56 with ~98mA remaining stored beam, and there was a first positive topup injection.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20150402/9c8919f1/attachment.html>
More information about the XRAYOPS
mailing list