[Xrayops] 103mA stored, Top-Up ongoing.
APS Experiment Hall X-ray Operations Problem List
xrayops at aps.anl.gov
Thu Aug 6 17:20:05 CDT 2015
On August 6th, 2015 at 4:29PM we experienced a partial beam loss. The beam instability experienced was caused by a feedback system issue which was quickly resolved. A fill-on-fill was performed at 04:50PM and stored beam was returned to ~103mA at 04:53PM. Top-Up is ongoing.
- Ops.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20150806/7c8f4de3/attachment.html>
More information about the XRAYOPS
mailing list