[Xrayops] Shutter permit enabled at 06:50 on 04/09/16.

APS Experiment Hall X-ray Operations Problem List xrayops at aps.anl.gov
Sat Apr 9 07:28:34 CDT 2016


There are 102mA stored beam. Top-up is ongoing.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20160409/fd598b1f/attachment.html>


More information about the XRAYOPS mailing list