[Xrayops] Top-Up resumed.

APS Experiment Hall X-ray Operations Problem List xrayops at aps.anl.gov
Sat Apr 16 06:31:16 CDT 2016


The injector RF issue has been resolved by switching to a backup RF system. Top-Up was resumed at 06:20AM with 88mA of stored beam.

-Ops.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20160416/06df7c90/attachment.html>


More information about the XRAYOPS mailing list