[Xrayops] Update concerning no Top-Up
APS Experiment Hall X-ray Operations Problem List
xrayops at aps.anl.gov
Fri Aug 5 04:45:10 CDT 2016
Power systems personnel are on-site repairing an issue with a pulsed power supply. The faulty power supply is necessary for injection and therefore precludes running Top-Up. Repairs should yield results within the next 30 minutes.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20160805/acee81aa/attachment.html>
More information about the XRAYOPS
mailing list