June 2016 Archives by subject
Starting: Wed Jun 1 20:44:12 CDT 2016
Ending: Thu Jun 30 10:52:43 CDT 2016
Messages: 82
- [Xrayops] Beam lost 22:46
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Beam motion & coupling issues 15:20
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Beam motion 10:43
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Beam motion/top-up 15:35
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] coupling and beam motion
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Due to an injector issue,Top-up aborted @ 0101hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] injector issue resolved, top-up resumed 03:15AM
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Injector was recovered and topup was resumed at 10:05PM with ~98mA stored beam
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Injector was recovered and topup was resumed at 16:17 with ~98mA stored beam
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Injector was recovered and topup was resumed at 2:23PM with ~98mA stored beam
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Next fill 21:10hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Next fill ~10:30hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Orbit control not running from 10:10 to 10:29
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Orbit Correction - suspended from 12:30 to 12:50AM in vertical plane.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Orbit correction suspended from 02:58 to 03:02AM
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Partial beam loss 20:09
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Refill complete 18:31
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Shutter Permit enabled
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Shutter permit enabled for the start of Fill #5 @ 10:21 hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Shutter permit issue delayed due to a SR issue.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Shutters enabled at 04:08AM.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Stored beam lost @ 20:29hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Stored beam lost, recovery and investigationg ongoing, ETA 04:00.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Stored beam lost, we are investigating.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Stored lost 08:50hrs due to a SR issue.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Sunday June 19, 2016 stored beam lost at 21:26.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Sunday June 19th, 2016 at 22:14 shutters enabled.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] top up
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top up ongoing
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top up restarted 16:04
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up aborted - injector issue - recovery ongoing.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted 01:40
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted 08:52
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted 16:27
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up aborted @ 08:06 due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted @00:03hrs due to an Injector issue.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted @12:03hrs due to an injector issue.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 01:16 due to an injector issue.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 01:29 due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 02:24 due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 02:49 due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 03:11 due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 10:56 06/06 due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 12:32 due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 14:28 due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 3:58PM due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 4:26PM due to an injector power supply issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted at 5:39PM due to an injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up aborted at 6:26PM - Emergency repairs to injector RF system.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up aborted at 7:24PM - injector issue.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up aborted due to injector issue.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] top-up restarted 09:14
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up restarted 17:58
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up restarted 21:05
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed 02:03
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed @ 08:43hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up resumed at 01:26.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 01:48
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 02:44
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 03:09
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 03:31
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up resumed at 04:48
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 08:09PM. 94mA stored.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up resumed at 12:23hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up resumed at 13:35 - Injectors recovered, 91mA stored.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 18:02 with 98mA remaining stored beam.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 23:11
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 2:51PM, 95mA stored.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up resumed at 4:23PM, 98mA stored.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up resumed at 4:55PM, fill-on-fill scheduled for 5:25PM.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up resumed at 6:38PM.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-Up suspended at 14:01 due to L2 RF trip.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up suspended at 15:52 due to L2 trip
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up was restarted at 11:14 06/03/16
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up was suspended at 10:51PM due to L2 trip.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Top-up was suspended at 21:42 due to L2 trip.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Topup suspended at 01:04 due to injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] Topup suspended at 04:26 due to injector issue
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] W/~102mA stored. Shutter permit enabled @20:59hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] With ~ 92mA stored; Top-Up resumed @ 01:57hrs.
APS Experiment Hall X-ray Operations Problem List
- [Xrayops] With ~98mA stored, Top-Up resumed 00:41hrs
APS Experiment Hall X-ray Operations Problem List
Last message date:
Thu Jun 30 10:52:43 CDT 2016
Archived on: Thu Jun 30 10:52:46 CDT 2016
This archive was generated by
Pipermail 0.09 (Mailman edition).