[Xrayops] Beam loss due to failed water pump PLC

APS Experiment Hall X-ray Operations Problem List xrayops at aps.anl.gov
Fri Mar 4 14:51:22 CST 2016


At 13:29 we experienced a beam loss when a converter tripped due to over-temperature. It was found that a failed PLC for an associated water pump was at fault. Currently, technicians are troubleshooting the PLC. An estimated time of repair is not currently available.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20160304/7de2ec92/attachment.html>


More information about the XRAYOPS mailing list