[Xrayops] Injector Downtime Update

APS Experiment Hall X-ray Operations Problem List xrayops at aps.anl.gov
Fri Jun 1 14:05:51 CDT 2018


The Booster RF issue has been repaired. Shortly before the Booster RF was repaired the Linac lost RF power. RF and Controls groups are investigating. Time for Linac repair completion is still to be determined.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20180601/12805b95/attachment.html>


More information about the XRAYOPS mailing list