[Xrayops] 15:00(3pm) RF Water Pump Switch 12/13/19

APS Experiment Hall X-ray Operations Problem List xrayops at aps.anl.gov
Fri Dec 13 14:38:11 CST 2019


An RF process water pump will be switched at 15:00 today. There is a  small possibility that beam may be lost during the switch.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20191213/139298a5/attachment.html>


More information about the XRAYOPS mailing list