[Xrayops] Top-Up resumed at 09:50 with ~98 mA remaining stored beam, and there was a first positive injection
APS Experiment Hall X-ray Operations Problem List
xrayops at aps.anl.gov
Tue Jan 29 09:51:27 CST 2019
Top-Up resumed at 09:50 with ~98 mA remaining stored beam, and there was a first positive injection
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.aps.anl.gov/pipermail/xrayops/attachments/20190129/336b722c/attachment.html>
More information about the XRAYOPS
mailing list