[Xrayops] APS Status Operator Message Update

APS Experiment Hall X-ray Operations Problem List xrayops at aps.anl.gov
Wed Jul 17 13:14:04 CDT 2019


Problem: none, injector recovered and topup resumed at 13:12
Activity: There was a first positive topup injection at 13:13 with 98mA SR beam
Estimated time of shutter enable: 
Next planned update: n/a



More information about the XRAYOPS mailing list