[Xrayops] Shutters ENabled No Top Up 95.5mA

APS Experiment Hall X-ray Operations Problem List xrayops at aps.anl.gov
Fri Nov 29 08:06:40 CST 2019


Problem: Shutters enabled with no top up 95.5mA of stored beam
Activity: Linac RF L4 modulator supply need to be replaced. Technicians are en route.
Estimated time of Top Up enable: N/A
Next planned update: 08:30