[Xrayops] APS Status Operator Message Update

APS Experiment Hall X-ray Operations Problem List xrayops at aps.anl.gov
Mon Jul 29 10:45:47 CDT 2024


Problem: Stored beam lost due to BLS arc detector trip. Recovery complete.
Activity: 50mA stored, swap-out ongoing. Shutter permit enabled.
Estimated time of shutter enable: 
Next planned update: 



More information about the XRAYOPS mailing list