Currently we are performing a fill-on-fill every two hours due to a
suspected storage ring kicker problem which resulted in a three beam
losses during a 15-hour period. After investigation, the P.S. group
found a capacitor which was leaking dielectric fluid. The capacitor
replacement started around 12:00 today after the recovery from a beam
loss. The repair may take a little more than two hours and we cannot be
certain the repair will eliminate the beam losses.
Once the repair has been completed, the MCR will do another fill-on-fill
and start Top-Up. If we have another beam loss with the same signature,
we will revert back to the fill-on-fill every two hours. We will
continue with this fill schedule at least until the next OPS Directorate
meeting at 10:30 on Monday, June 30.
Karen Schroeder