[Xrayops] Beam Loss 04/17 @03:36

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Fri Apr 17 04:09:31 CDT 2009


At 03:36 on Friday 04/17 an SR Power Supply failed causing a beam loss.

The failed supply is currently being replaced.

Estimated time of next Fill is 05:00


ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list