[Xrayops] Shutter Permit enabled @04:53

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Fri Apr 17 05:07:10 CDT 2009


Shutter Permit was enabled at 04:53 following the 03:36 beam loss caused by a 
failed SR Power Supply.

The Power Supply was replaced and SR beam recovered.


ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list