[Xrayops] (no subject)

APS Experiment Hall X-ray Operations Problem List xrayops at mailman.aps.anl.gov
Thu Feb 19 17:44:39 CST 2009


On 2/19/08 at 17:32, Top-up was aborted due to an injector problem. 
Investigation is underway. No repair time is known at this point.


ASD Operations Group
Main Control Room
(630) 252-9424



More information about the XRAYOPS mailing list