On Sunday 8/15/10, at 11:20, Top-Up was resumed. During the period from 11:03 to 11:20 coupling was elevated due to a sextupole magnet problem in the Storage Ring. The problem was corrected and coupling has returned to normal. Thank you, ASD Operations Group Main Control Room (630) 252-9424