On 18 August 2010 at 12:52, top-up was suspended due to an injector problem. After recovery of injector beam, top-up was resumed at 12:57, with approximately 98mA stored. At 13:06, SR current reached 100mA and has not fallen below that mark since 13:08. ASD-Operations