[Xrayops] Extensive Downtime (Fill #8)
APS Experiment Hall X-ray Operations Problem List
xrayops at mailman.aps.anl.gov
Tue Feb 16 07:20:36 CST 2010
Fill #8 was lost at 06:07 due to a tripped breaker which affected several water
and PS systems. Recovery is not expected until after the Machine Studies period
starts at 08:00 this morning. User Beam is scheduled to restart at 08:00
Wednesday morning.
ASD Operations Group
Main Control Room
(630) 252-9424
More information about the XRAYOPS
mailing list